Application Fees

Please be advised, on February 28, 2022 certain application fees were amended.  Below is a list of the current application fees (per Resolution 2-2022):

Application/Permit TypeFee
Administrative Adjustment$250
Administrative Appeal0
Amendment (text) to the Land Development Code$250
Comprehensive Development Plan (CDP) Amendment$750
Conditional Use Permit$500
Film Industry Permit$100
Floodplain Development Permit$250
Inspection, Testing and Maintenance of Private Fire Hydrants$30 per hydrant
Lot Split/Lot Line Adjustment$200
Planned Development (new or amendment)$1500
Pre-Application Meeting$0
Rezoning (non Planned Development)
$750
Right-of-Way or Public Easement Abandonment
$100
Right-of-Way Permit - Construction
$90 + 1% of construction costs (franchise agreement-holders exempt)
Right-of-Way Permit - Sidewalks/Driveways Only$100
Short Term Rental Certificate (new)$200
Short Term Rental Certificate (renewal)$75
Short Term Rental Certificate (transfer)$75
Site Construction Permit/Right-of-Way Permit Revisions$100 per sheet
Site Plan Review$750 (initial submittal); $200 per resubmittal after the second staff review.
Site Plan Revision (minor change)$100
Small-Cell Wireless Permit$150
Special Event Permit$100
Subdivision Plan (preliminary)$750
Subdivision Plan (final)$500
Technical Testing and Review for Construction of Radio/Data Transmission Antennas$3500 (unused portion over initial $10 processing fee will be refunded at conclusion of testing)
Vegetation and Tree Removal Permit (single family residential)$15 per lot
Vegetation and Tree Removal Permit (multi-family residential or non-residential)
$15 per acre
Vested Rights Determination (residential properties)$100
Vested Rights Determination (non-residential properties)$300
Waiver of District Requirements (Downtown and West Side)$250 per administrative review; $750 per board review
Wetland Alteration Permit$100
Zoning Variance$750
Zoning Verification Letter$200


Pass-Through Fee

A $5,000 review deposit, payable to the City of Maitland, as specified in Article XVI, Chapter 7.5 (Section 7.5-143) of the City Code is required when submitting an application for development review.  The review deposit is used to reimburse the City for the actual expenses incurred by the City (i.e. reviews by City consultants, City attorney or legal advertising requirements) as a result of the review of the development application. 

A waiver of this requirement may be acceptable under certain conditions as specified in Article XVI, Chapter 7.5, Section 7.5-143 (c) of the City Code. Pass-through fees will be carried forward to other aspects of development review as a project moves through the review cycle, including site permits and inspections. At the conclusion of the development, applicants are reimbursed any remaining balance.

 Applications/petitions where pass through fees apply include: 

  • Comprehensive plan amendment
  • Concurrency determination
  • Construction site permit
  • Development agreement, formulation and review
  • Development of regional impact
  • Final subdivision plat, including any revisions to a previously approved or existing subdivision or plat
  • Permitted conditional use
  • Planned development
  • Preliminary subdivision plat
  • Rezoning (with or without a comprehensive plan amendment)
  • Site plan review
  • Substantial change in any of the above 
  • Other development-related application as determined by the city manager